Regulatory Approval Automation

Internal change approvals

Last checked 2026-11-13

Short answer: Not every approval comes from a regulator. Management-of-change and engineering change approvals happen inside your business, often because a licence, standard or customer requires them. An AI worker can draft the change request, check it against your procedure, gather affected documents and chase reviewers. The reviewers and approvers named in your procedure make the decision and sign it.

A change to a process, plant, product or procedure can affect safety, quality or an existing approval. A good change record shows what changed, why, who reviewed it and who approved it.

On this page

What a change approval needs

Your own procedure sets the requirements. Most change records cover:

Where an AI worker helps

  1. Draft the request. From a short description in Teams, the AI drafts a change request in your Word template.
  2. Find what is affected. It searches SharePoint and OneDrive for drawings, procedures and work instructions that mention the item being changed, and lists them.
  3. Check against the procedure. It compares the request with your change procedure and flags missing fields, a missing discipline review or an absent risk assessment.
  4. Route and chase. It sends the request to the reviewers your procedure names, reminds them in Teams and records who has responded.
  5. Close out. After approval, it builds a task list in Planner for document updates and training, and tracks it to completion.

It asks before anything important goes out, and in Word each change it makes to a document is approved by you.

US life sciences: 21 CFR Part 11 audit trails

In the United States, FDA-regulated businesses that keep electronic records must meet 21 CFR Part 11. Section 11.10(e) requires the use of "secure, computer-generated, time-stamped audit trails" and says "record changes shall not obscure previously recorded information".

The Everything does not claim to be a Part 11 compliant or validated system. If your change records fall under Part 11, keep the record of approval in your validated quality system. An AI worker can still help draft and gather material, but the approval itself and its audit trail belong in the system your quality team has validated.

The principle is useful even outside Part 11: never overwrite an approved record. Keep each version, and add new entries instead of editing old ones. See approval evidence packs.

What stays with a person

Before you start

Approval files hold drawings, site details, personal information about neighbours and staff, and sometimes commercially sensitive designs. Before you point any AI tool at them, check your own obligations:

Your data is not used to train AI models, and if you cancel, your files stay where they always were, in your Microsoft account.

Questions people ask

Can the AI approve a change?

No. It drafts, checks and routes. Approval is made by the people your procedure names.

Is The Everything 21 CFR Part 11 compliant?

It does not claim to be. If your records fall under Part 11, keep approvals and audit trails in your validated system.

Can it find every document a change affects?

It can search the SharePoint and OneDrive locations it has access to and list what it finds. Someone who knows the process should check the list for anything held elsewhere.

Does it work with our existing change form?

Yes, if the form is a Word or Excel template in Microsoft 365. It drafts into your template rather than inventing a new one.

Try an AI worker on your next application

The Everything works inside your Microsoft 365 and Teams. It gathers, checks and drafts; you approve, sign and lodge. $400 AUD a month plus GST per company, with a 14-day free trial and no credit card.

See how The Everything works